Newsreels
Structural problems add £2.5m to Stockton Globe restoration
Contractors have discovered a range of issues with the building, including rotted timber and damaged drains. The council, which has already dedicated £13.5m to the project, described the problems as “much, much worse” than expected.
Join the Discussion
You must be logged in to post a comment.